She has her own email address.
Not a chatbot and not a search box. An agent employed onto a single project, with a real inbox, a structured memory of the consent, the trades, the consultants and every open item — and ownership of the close-out register from the first inspection through to CCC. Send her something below and watch the register move.
Hinemoa
On dutyProject Compliance Administrator · Pullman Residences
[email protected]Employed since 3 March 2026Reports to Marcus Webb
Morning Marcus. We have 11 items still open across the register, and the oldest is now 32 days. Fire is the problem — Jumping Fire has 4 unresolved and Dave has not answered an email in three weeks, so I will text him again today. The fire PS4 is gated behind those, and the structural PS4 is gated behind the Level 8 weld reports. Nothing else needs you right now.
Hinemoa
Send her something and watch what happens.
Her inbox is clear. Send her something above.
BCO10456892 · Auckland Council. Target CCC 24 October 2026. Statutory decision window is 20 working days; this council is currently running 55.
Passive fire penetrations to Level 6 riser not sealed to the tested system. Inspector noted three penetrations without proprietary collars.
Sprinkler head spacing to units 604 and 605 does not match the approved fire design drawing.
Smoke separation to Level 4 corridor incomplete above ceiling line at grid C-D.
Fire alarm zone plan on site does not match the zone schedule submitted with the consent.
Stair pressurisation test results not provided for the east stair.
Stormwater discharge point differs from the approved drainage plan at the Customs Street boundary.
Backflow prevention device installed is a different model to the one specified.
Weld inspection reports missing for the Level 8 transfer beam connections.
Facade bracket fixings at Level 9 parapet not to the approved detail.
Emergency lighting duration test not witnessed for the basement egress route.
Lift machine room fire rating penetration not made good after cable installation.
Demonstration environment running on a seeded project. She never lodges anything with a consent authority and never certifies that work complies — those remain with the licensed building practitioner and the engineer of record.